Can I wire DAN-10-150 from this page?
No. Obtain the exact revision-specific connector drawing and electrical specification before wiring. No pin assignment, supply limit or command sequence is inferred from a model name.
Independent evaluation guide — not an official Dimetix document. Keyword pairing does not establish equivalence. Source completeness does not establish compatibility or a current commercial offer.
For a Dimetix DAN-10-150 pinout or protocol question, obtain the connector drawing for the exact hardware revision before connecting power. Confirm the view direction, pin numbering, connector keying and cable variant. Wire color by itself is not reliable identification. This page intentionally contains no guessed pin assignments, voltage limits or command bytes; the input keyword list is not an electrical source document.
Check supply and signal requirements separately. A supported communication label does not establish electrical compatibility, baud settings, framing, address selection or message format. Identify the ground reference, input tolerances and any required level conversion from the applicable documentation. Begin with an appropriate current-limited bench setup and verify the connection plan before sending commands or attaching the module to an existing controller.
ERDI LRF0305C needs its own confirmed wiring and protocol documentation; do not transplant the competitor cable map or decoder merely because both devices report distance. Record byte order, units, checksum coverage, startup timing and invalid-reading behavior during integration. Where documentation conflicts or omits a detail, request clarification for the delivered revision and keep that connection or parser assumption unresolved until the evidence is available.
Competitor values use the supplied source URL, capture date and confidence record; ERDI values additionally require a matching source excerpt. Capture dates record retrieval, not publication or revision dates. Missing or unsupported entries stay marked as Not published, describing a gap in the supplied evidence rather than an exhaustive vendor search.
| Parameter | Dimetix DAN-10-150 | ERDI LRF0305C |
|---|---|---|
| Measurement range (m) | Natural surfaces 0.05...100 m (datasheet: 0.05...~100 m); Dimetix orange reflective foil ~… | ≥ 4000m @60% Reflectivity, Building Target ≥3000m @30% Reflectivity, 2.3×2.3m Target ≥1500m @30% Reflectivity, 0.5×1.7m Target ≥800m @30% Reflectivity, 0.2×0.3m Target |
| Accuracy (cm) | ±1.0 mm @2σ (±0.5 mm @1σ), typical; repeatability ±0.3 mm @2σ (±0.15 mm @1σ) | ±1 m |
| Update rate (Hz) | Max. measuring rate 100 Hz (TRM fn.11: 100 Hz valid for prod… | Not published |
| Electrical interface and protocol | Analog 0/4...20 mA programmable (max error ±0.1%); 1 digital input; 2 … | Not published |
| Supply voltage (V) | 12...30 VDC; 0.15 A @24 VDC / … | DC 3~5V |
| Wavelength (nm) | 620-690 nm (red, typical 655 n… | Not published |
| Field of view (deg) | Not published | Not published |
| Published price (USD) | Not published | Not published |
Source: https://dimetix.com/wp-content/uploads/2025/08/TechnicalReferenceManual_DSeries_V116.pdf (captured , confidence high)
SOURCE_URL: https://erdilrf.com/models/lrf0305c/
CAPTURED_AT:
≥ 4000m @60% Reflectivity, Building Target ≥3000m @30% Reflectivity, 2.3×2.3m Target ≥1500m @30% Reflectivity, 0.5×1.7m Target ≥800m @30% Reflectivity, 0.2×0.3m Target | ±1 m | DC 3~5V | ≤ 27×25×15.5mm(L×W×H)
No. Obtain the exact revision-specific connector drawing and electrical specification before wiring. No pin assignment, supply limit or command sequence is inferred from a model name.
The supplied parameter record lacks a usable value or complete source metadata. ERDI entries additionally require a supporting source excerpt. These are evidence gaps in this record, not zero values and not proof that the feature is absent.
Use the model link to review the candidate, then send the intended application, target conditions, host interface and quantity through the contact page. Request the applicable documents and a scoped assessment rather than assuming compatibility.
Provide the required measurement function and operating conditions so the candidate can be assessed against the application. Model names and this planning association alone do not constitute a compatibility recommendation.